Friday, 19 Apr, 2024

National

Padma Bridge 1950 meter visible now

15 |
Update: 2019-05-25 11:41:29
Padma Bridge 1950 meter visible now The 13th span

MUNSHIGANJ:  The 13th span (super structure) of the 6.15-kilometre Padma Bridge was installed between 14 and 15 number pillars at Mawa point making 1950 meters of the bridge visible.

The installation work finished around 09:55 am on Saturday (May 25).

The 13th span was erected after 18 days of the 12th span.

The 1st span was set up on September 30, 2017. Two-story Padma Bridge is being built for multipurpose. Concrete and still are main ingredients of the bridge.

BDST: 1141 HRS, MAY 25, 2019

AH

 

 

All rights reserved. Sale, redistribution or reproduction of information/photos/illustrations/video/audio contents on this website in any form without prior permission from banglanews24.com are strictly prohibited and liable to legal action.